Welcome to Taizhou Cheng Shunrefrigeration equipment Co., Ltd

< >

Industry News

Location:Home  >  NEWS > Industry News >

How to install a safety & perfect cold room & refrigeration system 2?

  Type:Industry News   Date:2018-01-18 09:51:35  
How to install a safety & perfect cold room & refrigeration system 2?

We talked about 5 items about how to assemble a safety & perfect cold room & refrigeration.The installation team engineers should have enough technical skill and satety operation,post wiring control box in a safe and cooling air place,avoid water & gas pipe,screw compressor & scroll compressor should have a right rotation.we can check it from H/L pressure gauge.also the compressor unit need be checked and maintenance regular.
 

Today let us still go on discussing about how to install a safety & perfect cold room & refrigeration system step by step.
 

1.When assemble sensors lines.do not touch other lines,this line should cross the plastic pipe only.The joint of long line must be water proof.The lead length should not be exceed 100m.in case of affect the precision of measurement.
 

2.Probe of defrosting sensor should be mounted at a 45 degrees position on the top of evaporator return gas pipe. About 100-200mm from the wall plate of evaporator,platinum with 0.1-0.3mm copper pipe around the sensor,together with 2-3 laps back. Tie well with copper wire and then pack it well with insulation material.
 

3.The temperature controller parameter setting should according to the request of storing goods,adjust defrosting cycle time, defrosting blank time,defrosting stop temperature,drop water time after defrost according evaporator crystal state.
 

4.Evaporator with electric defrost must be setted defrosting stop temperature before use,in case of temperature controller breaks or the defrosting time parameter does not work when heat defrost.lead to the temperature of cold room increase and lose property.
 

5.When the refrigerating system is vacuum state,please do not make the compressor running,in case of motor coil broken or the valves broken.
 

6.Cold room of medium and low temperature reduce the temperature should be several times,in case of the panels were changed or broken because of big temperature different.
 

7.Please mark that "Other than the operator should not touch" after installations.wrong operating will lead to accident.
 

8.Please take good care of the instruction book.
 

So if you have any other questions.please feel free to contact us soon.
 

Contact Us:
 

www.chinatechco.com
E-mail: info@chinatechco.com
Whats App:0086 15952606481
Tel:0086 1595606481
Skype: alanrefrigeration 
Wechat:15952606481
QQ:304396902